Lichfield Surveyors report on Structural Movement of a Gable Wall

 

 Front of 1920's house

Front elevation

Leaning gable apex

Leaning gables apex

Deflection of the wall comprd to a level

Deflection of the wall compared to a spirit level

Metal restraining strap

 

Restraining strap

Strapping of the new wall to the roof structure

The property is a detached two storey house of solid brick wall and pitched slate construction constructed about 1925. The property is rectangular with a two storey projection at the rear.

 

The rear gable end of the main part of the property leans out about 150mm above first floor level. Measurement with a spirt level suggest that the top fifteen course of bricks lean out from above the point at which two large longitudinal structural roof timbers bear into the wall. The top ten course of the wall are of single skin construction and particularly vulnerable to further movement.

 

The wall only supports itself and the likely cause of the leaning wall is failure to restrain it at the time of construction. As it appears that the wall may move under the load of being pushed with a hand it should be restrained as soon as possible.

 

Remedial works are as follows

 

  1. Demolish the top fifteen course of brickwork and rebuild them with a 225mm wall tied together with either bricks laid across the wall or metal ties. Straps set into the centre of the wall can be secured to the roof structure. The straps can be secured to the existing longitudinal timbers and to planks screwed across and perpendicular to the rafters just below each side of the apex.  18mm x 120mm x 2.4m floor boards or similar would suffice.

 

  1. The existing wall can be strapped to the roof structure as described above with raw plugs. An inner leaf can then be constructed for the top ten courses and tied to the outer facer of the wall with metal ties cemented into raked out sections of the existing mortar.

 

 

 

 

Surveyors in Derby Area                 Homebuyers Surveys in Derby                 Building surveys in Derby                RICS Surveyors in Derby                RICS Valuations in Derby

 Surveyors in Nottingham area       Homebuyers surveys in Nottingham          Building Surveys in Nottingham          RICS Surveys in Nottingham            RICS Valuations Nottingham

Surveyors in Sheffield            Homebuyers Survey Reports in Sheffield

Structural and Building Surveys in Sheffield         Property Valuations in Sheffield

Chartered Surveyors in Sheffield    RICS Surveyors in Sheffield

 surveyors in bimingham coventry rics surveyors rics surveyors in stoke on trent